Torrevieja Endorses A €3.9 Million Port Plan

Trending 11 hours ago

Planned upgrades purpose to modernise Torrevieja’s waterfront. Photo credit: Ayuntamiento de Torrevieja

Torrevieja has taken different measurement successful nan guidance of modernising its larboard pinch nan support of nan last shape of works. The Local Government Board has endorsed Subproject 9, a €3.93 cardinal scheme to merge nan waterfront pinch nan metropolis betwixt Acequión formation and nan Dique de Levante breakwater. 

This subproject is portion of a wider urbanisation programme designed to toggle shape nan port area and its reclaimed onshore into a abstraction that is much accessible, attractive, and useful. While nan statement has an expected long of 8 months, bidding companies will beryllium assessed connected their expertise to get nan task done much quickly. At nan moment, it looks arsenic though it will beryllium completed by early summertime 2026.

Key features of nan scheme see completing nan main entree way moving from nan Hombre del Mar promenade straight to nan Levante Breakwater. From here, location will beryllium a relationship to nan elevated footbridge starring to nan Leisure Centre. In addition, electrical systems, nan quay wherever boats are moored, and nan cantilevered walkway will beryllium upgraded.

In an effort to make nan larboard much modern and welcoming, nan task besides introduces landscaping, lighting, thoroughfare furniture, and ornamental details. The only abstracted statement still to beryllium awarded covers nan kiosks for nan Hippies’ marketplace stalls.

Once finished, Torrevieja will summation a modern waterfront afloat connected pinch nan municipality cloth of nan city.

More